Twelve questions worth asking
- Are you insured, and can you send a certificate of insurance today?
- Is this quote a trace-over of my existing layout or a new measured layout?
- How many coats of paint, and what product are you using?
- Will you confirm my required ADA stall count before painting?
- Can the work be done overnight or on a weekend?
- How long until the lot can take traffic?
- How do you protect fresh paint from drivers?
- What happens if it rains on the scheduled day?
- Are stencils, arrows, curbs and signage included or extra?
- Who cleans the lot before you paint?
- Will you send before-and-after photos?
- How long has the crew doing my lot been striping?
Red flags
- A price quoted over the phone without seeing or measuring the lot
- No written quote, or a quote with a single lump-sum line
- No proof of insurance
- Willingness to paint over a wet, dirty or crumbling surface
- No mention of ADA requirements at all
- Pressure to pay the full amount before any work happens
Reading the quote
A good striping quote reads like an inventory: stall count, line type, coat count, each stencil, each crosswalk, linear feet of curb, ADA stalls and signage, scheduled window, and cure and protection plan.
If two bids differ by a lot, the itemized version almost always explains why — one is a single coat trace-over and the other is a two-coat new layout with ADA corrections. Those are not the same job.
Why local matters in Rhode Island
A contractor who works here every week knows what plow damage looks like, how much salt abrasion to expect on a north-facing lot, which towns are particular about fire lane color, and how tight the spring and fall calendar gets.
It also means a site visit can happen within a day or two instead of next week, which matters when you are correcting a failed inspection or opening a property on a deadline.