The 30-day guideline

Fresh hot-mix asphalt contains oils that rise to the surface as it cures. Paint applied too soon can bleed, discolor or peel. Most manufacturers and contractors recommend waiting roughly 30 days before permanent striping.

If the lot has to open immediately, a light temporary coat can go down right away, followed by a full coat after curing.

What about sealcoating?

Sealcoating new asphalt is usually done after 6 to 12 months. If sealcoating is planned, schedule final striping after it — otherwise the new lines get covered.

Coordinating with your paver

  • Get the layout drawing done before paving
  • Ask the paver for final grades so drainage doesn't pond on ADA stalls
  • Schedule temporary lines for opening day
  • Book permanent striping 30 days out